The Resource Construction manager-at-risk project delivery for highway programs, consultants, Douglas D. Gransberg and Jennifer S. Shane

Construction manager-at-risk project delivery for highway programs, consultants, Douglas D. Gransberg and Jennifer S. Shane

Label
Construction manager-at-risk project delivery for highway programs
Title
Construction manager-at-risk project delivery for highway programs
Statement of responsibility
consultants, Douglas D. Gransberg and Jennifer S. Shane
Creator
Contributor
Subject
Language
eng
Summary
TRB's National Cooperative Highway Research Program (NCHRP) Synthesis 402: Construction Manager-at-Risk Project Delivery for Highway Programs explores current methods in which state departments of transportation and other public engineering agencies are applying construction manager-at-risk (CMR) project delivery to their construction projects. CMR project delivery is an integrated team approach to the planning, design, and construction of a highway project, to help control schedule and budget, and to help ensure quality for the project owner. The team consists of the owner; the designer, who might be an in-house engineer; and the at-risk construction manager. The goal of this project delivery method is to engage at-risk construction expertise early in the design process to enhance constructability, manage risk, and facilitate concurrent execution of design and construction without the owner relinquishing control over the details of design as it would in a design-build project
Member of
Additional physical form
Also available online.
Cataloging source
TRL
http://library.link/vocab/creatorName
Gransberg, Douglas D
Funding information
Research sponsored by the American Association of State Highway and Transportation Officials in cooperation with the Federal Highway Administration
Illustrations
  • illustrations
  • maps
  • forms
Index
no index present
Literary form
non fiction
Nature of contents
  • bibliography
  • technical reports
http://library.link/vocab/relatedWorkOrContributorName
  • Shane, Jennifer Sue
  • National Research Council (U.S.)
  • National Cooperative Highway Research Program
  • American Association of State Highway and Transportation Officials
  • United States
Series statement
Synthesis of highway practice,
Series volume
402
http://library.link/vocab/subjectName
  • Road construction contracts
  • Roads
  • Highway engineering
  • Project management
  • Government contractors
  • Construction projects
  • construction management
  • project management
  • Government contractors
  • Highway engineering
  • Project management
  • Road construction contracts
  • Roads
  • United States
Label
Construction manager-at-risk project delivery for highway programs, consultants, Douglas D. Gransberg and Jennifer S. Shane
Link
Instantiates
Publication
Note
  • At head of title: National Cooperative Highway Research Program
  • "A synthesis of highway practice."
Bibliography note
Includes bibliographical references (p. 91-95)
Contents
Ch. 2. Literature, Methodology, And Case Studies -- Ch. 3. Procedures -- Ch. 4. Construction Manager-At-Risk Selection Methods -- Ch. 5 Preconstruction Services -- Ch. 6. Procedures For Establishing The Guaranteed Maximum Price -- Ch. 7. Quality Management Procedures -- Ch. 8. Barriers To Implementation
Dimensions
28 cm.
Extent
127 p.
Isbn
9780309143011
Isbn Type
(softcover)
Lccn
2009938319
Other physical details
ill., map, forms
Specific material designation
remote
System control number
  • (OCoLC)539423817
  • (OCoLC)ocn539423817
Label
Construction manager-at-risk project delivery for highway programs, consultants, Douglas D. Gransberg and Jennifer S. Shane
Link
Publication
Note
  • At head of title: National Cooperative Highway Research Program
  • "A synthesis of highway practice."
Bibliography note
Includes bibliographical references (p. 91-95)
Contents
Ch. 2. Literature, Methodology, And Case Studies -- Ch. 3. Procedures -- Ch. 4. Construction Manager-At-Risk Selection Methods -- Ch. 5 Preconstruction Services -- Ch. 6. Procedures For Establishing The Guaranteed Maximum Price -- Ch. 7. Quality Management Procedures -- Ch. 8. Barriers To Implementation
Dimensions
28 cm.
Extent
127 p.
Isbn
9780309143011
Isbn Type
(softcover)
Lccn
2009938319
Other physical details
ill., map, forms
Specific material designation
remote
System control number
  • (OCoLC)539423817
  • (OCoLC)ocn539423817

Library Locations

  • Architecture LibraryBorrow it
    Gould Hall 830 Van Vleet Oval Rm. 105, Norman, OK, 73019, US
    35.205706 -97.445050
  • Bizzell Memorial LibraryBorrow it
    401 W. Brooks St., Norman, OK, 73019, US
    35.207487 -97.447906
  • Boorstin CollectionBorrow it
    401 W. Brooks St., Norman, OK, 73019, US
    35.207487 -97.447906
  • Chinese Literature Translation ArchiveBorrow it
    401 W. Brooks St., RM 414, Norman, OK, 73019, US
    35.207487 -97.447906
  • Engineering LibraryBorrow it
    Felgar Hall 865 Asp Avenue, Rm. 222, Norman, OK, 73019, US
    35.205706 -97.445050
  • Fine Arts LibraryBorrow it
    Catlett Music Center 500 West Boyd Street, Rm. 20, Norman, OK, 73019, US
    35.210371 -97.448244
  • Harry W. Bass Business History CollectionBorrow it
    401 W. Brooks St., Rm. 521NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • History of Science CollectionsBorrow it
    401 W. Brooks St., Rm. 521NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • John and Mary Nichols Rare Books and Special CollectionsBorrow it
    401 W. Brooks St., Rm. 509NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • Library Service CenterBorrow it
    2601 Technology Place, Norman, OK, 73019, US
    35.185561 -97.398361
  • Price College Digital LibraryBorrow it
    Adams Hall 102 307 West Brooks St., Norman, OK, 73019, US
    35.210371 -97.448244
  • Western History CollectionsBorrow it
    Monnet Hall 630 Parrington Oval, Rm. 300, Norman, OK, 73019, US
    35.209584 -97.445414
Processing Feedback ...