The Resource Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997, (electronic resource)

Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997, (electronic resource)

Label
Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997
Title
Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS)
Title remainder
hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997
Creator
Subject
Language
eng
Member of
Cataloging source
LexisNexis
http://bibfra.me/vocab/lite/collectionName
LexisNexis U.S. Congressional Hearings Digital Collection
Government publication
federal national government publication
Illustrations
illustrations
Index
no index present
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/subjectName
  • United States
  • Artificial satellites in navigation
  • Aids to air navigation
  • Global Positioning System
  • Waste in government spending
Label
Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997, (electronic resource)
Link
http://libraries.ou.edu/access.aspx?url=http://www.lexisnexis.com/congcomp/getdoc?HEARING-ID=HRG-1997-HTI-0032
Instantiates
Publication
Note
Record is based on bibliographic data in LexisNexis Congressional Hearings Digital Collection. Reuse except for individual research requires license from LexisNexis Academic & Library Solutions
Antecedent source
mixed
Bibliography note
Includes bibliographical references
Color
black and white
Dimensions
24 cm.
Dimensions
unknown
Extent
iii, 224 p.
File format
one file format
Form of item
electronic
Level of compression
mixed
Other physical details
ill.
Quality assurance targets
present
Reformatting quality
preservation
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
  • 3450246-01okla_normanlaw
  • (SIRSI)3450246
  • (Sirsi) cis2007479110
System details
System requirements: PDF reader software
Label
Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997, (electronic resource)
Link
http://libraries.ou.edu/access.aspx?url=http://www.lexisnexis.com/congcomp/getdoc?HEARING-ID=HRG-1997-HTI-0032
Publication
Note
Record is based on bibliographic data in LexisNexis Congressional Hearings Digital Collection. Reuse except for individual research requires license from LexisNexis Academic & Library Solutions
Antecedent source
mixed
Bibliography note
Includes bibliographical references
Color
black and white
Dimensions
24 cm.
Dimensions
unknown
Extent
iii, 224 p.
File format
one file format
Form of item
electronic
Level of compression
mixed
Other physical details
ill.
Quality assurance targets
present
Reformatting quality
preservation
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
  • 3450246-01okla_normanlaw
  • (SIRSI)3450246
  • (Sirsi) cis2007479110
System details
System requirements: PDF reader software

Library Locations

  • Architecture LibraryBorrow it
    Gould Hall 830 Van Vleet Oval Rm. 105, Norman, OK, 73019, US
    35.205706 -97.445050
  • Bizzell Memorial LibraryBorrow it
    401 W. Brooks St., Norman, OK, 73019, US
    35.207487 -97.447906
  • Boorstin CollectionBorrow it
    401 W. Brooks St., Norman, OK, 73019, US
    35.207487 -97.447906
  • Chinese Literature Translation ArchiveBorrow it
    401 W. Brooks St., RM 414, Norman, OK, 73019, US
    35.207487 -97.447906
  • Engineering LibraryBorrow it
    Felgar Hall 865 Asp Avenue, Rm. 222, Norman, OK, 73019, US
    35.205706 -97.445050
  • Fine Arts LibraryBorrow it
    Catlett Music Center 500 West Boyd Street, Rm. 20, Norman, OK, 73019, US
    35.210371 -97.448244
  • Harry W. Bass Business History CollectionBorrow it
    401 W. Brooks St., Rm. 521NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • History of Science CollectionsBorrow it
    401 W. Brooks St., Rm. 521NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • John and Mary Nichols Rare Books and Special CollectionsBorrow it
    401 W. Brooks St., Rm. 509NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • Library Service CenterBorrow it
    2601 Technology Place, Norman, OK, 73019, US
    35.185561 -97.398361
  • Price College Digital LibraryBorrow it
    Adams Hall 102 307 West Brooks St., Norman, OK, 73019, US
    35.210371 -97.448244
  • Western History CollectionsBorrow it
    Monnet Hall 630 Parrington Oval, Rm. 300, Norman, OK, 73019, US
    35.209584 -97.445414
Processing Feedback ...