Coverart for item
The Resource Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997

Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997

Label
Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997
Title
Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS)
Title remainder
hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997
Creator
Subject
Language
eng
Cataloging source
GPO
Government publication
federal national government publication
Illustrations
illustrations
Index
no index present
Literary form
non fiction
Nature of contents
bibliography
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/subjectName
  • Artificial satellites in navigation
  • Aids to air navigation
  • Global Positioning System
  • Waste in government spending
  • United States
Label
Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997
Instantiates
Publication
Note
  • Distributed to some depository libraries in microfiche
  • Shipping list no.: 98-0223-P
  • "105-39."
Bibliography note
Includes bibliographical references
Dimensions
24 cm.
Extent
iii, 224 p.
Isbn
9780160563867
Other physical details
ill.
System control number
  • 1374372-01okla_normanlaw
  • (SIRSI)1374372
  • (Sirsi) o39115863
  • (OCoLC)39115863
  • (GPO)97092567
Label
Allegations of cost overruns and delays in the FAA's Wide Area Augmentation System (WAAS) : hearing before the Subcommittee on Aviation of the Committee on Transportation and Infrastructure, House of Representatives, One Hundred Fifth Congress, first session, October 1, 1997
Publication
Note
  • Distributed to some depository libraries in microfiche
  • Shipping list no.: 98-0223-P
  • "105-39."
Bibliography note
Includes bibliographical references
Dimensions
24 cm.
Extent
iii, 224 p.
Isbn
9780160563867
Other physical details
ill.
System control number
  • 1374372-01okla_normanlaw
  • (SIRSI)1374372
  • (Sirsi) o39115863
  • (OCoLC)39115863
  • (GPO)97092567

Library Locations

  • Architecture LibraryBorrow it
    Gould Hall 830 Van Vleet Oval Rm. 105, Norman, OK, 73019, US
    35.205706 -97.445050
  • Bizzell Memorial LibraryBorrow it
    401 W. Brooks St., Norman, OK, 73019, US
    35.207487 -97.447906
  • Boorstin CollectionBorrow it
    401 W. Brooks St., Norman, OK, 73019, US
    35.207487 -97.447906
  • Chinese Literature Translation ArchiveBorrow it
    401 W. Brooks St., RM 414, Norman, OK, 73019, US
    35.207487 -97.447906
  • Engineering LibraryBorrow it
    Felgar Hall 865 Asp Avenue, Rm. 222, Norman, OK, 73019, US
    35.205706 -97.445050
  • Fine Arts LibraryBorrow it
    Catlett Music Center 500 West Boyd Street, Rm. 20, Norman, OK, 73019, US
    35.210371 -97.448244
  • Harry W. Bass Business History CollectionBorrow it
    401 W. Brooks St., Rm. 521NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • History of Science CollectionsBorrow it
    401 W. Brooks St., Rm. 521NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • John and Mary Nichols Rare Books and Special CollectionsBorrow it
    401 W. Brooks St., Rm. 509NW, Norman, OK, 73019, US
    35.207487 -97.447906
  • Library Service CenterBorrow it
    2601 Technology Place, Norman, OK, 73019, US
    35.185561 -97.398361
  • Price College Digital LibraryBorrow it
    Adams Hall 102 307 West Brooks St., Norman, OK, 73019, US
    35.210371 -97.448244
  • Western History CollectionsBorrow it
    Monnet Hall 630 Parrington Oval, Rm. 300, Norman, OK, 73019, US
    35.209584 -97.445414
Processing Feedback ...